G4CCH | 5.4 Metre Dish Project 1999/2000 |
Assembling
the Dish Structure
08 January 2000 The dish structure was assembled with the mast tilted over for easy access to the hub and tilt mechanism.
|
||
The
16 Rib sections were attached to the hub and the outer rim fabricated on
to the ends of the Ribs.
The basic structure is stable and strong enough to be erected until the next stage of the project. |